opex

Results 51 - 68 of 68Sort Results By: Published Date | Title | Company Name
By: Aerohive     Published Date: Oct 01, 2012
Next Generation Access Network Architecture:Protocols are Free
Tags : aerohive, data, network architecture, capex, opex
     Aerohive
By: Cisco     Published Date: Jan 14, 2014
Top Five Mistakes in Consolidating and Virtualizing the Data Center.
Tags : cisco, data center, virtualizing, data center demand, capital expenditures, (capex), operating expenses (opex), it management
     Cisco
By: BubblewrApp     Published Date: Jan 20, 2015
"Agile companies push new application versions to production every few weeks, sometimes even faster. With super-fast Beta cycles being the norm, getting various user groups, such as remote QA teams, access to staging environments can slow down your delivery timelines. What if you could enable secure access for any number of users in 15 minutes? BubblewrApp’s Service Access Service (SAS) is a turnkey, cloud-based service that acts as the first line of defense for your applications. BubblewrApp’s SAS enables its customers to grant easy access to applications deployed ""behind the firewall"" (on premise) or ""inside the Virtual Private Cloud"" (in a public cloud) from any remote location. Customers can begin leveraging SAS within minutes without requiring any changes to pre-existing network and security policies. The result is a vastly superior secure application access model that enables a zero CapEx, low OpEx model for secure application access, both on premise and in the public cloud."
Tags : secure access, security policies, new applications, delivery timeline, cloud-based service, sas, application access model, software development
     BubblewrApp
By: Schneider Electric     Published Date: Jun 04, 2014
Standardized, scalable, pre-assembled, and integrated data center facility power and cooling modules provide a “total cost of ownership” (TCO) savings of 30% compared to traditional, built-out data center power and cooling infrastructure. Avoiding overbuilt capacity and scaling the design over time contributes to a significant percentage of the overall savings. This white paper provides a quantitative TCO analysis of the two architectures, and illustrates the key drivers of both the capex and opex savings of the improved architecture.
Tags : schneider, electric, data, center, scalable, integrated, power, cooling
     Schneider Electric
By: Symantec     Published Date: Jun 13, 2018
It’s a free-for-all out there. Employees and organizations are adopting cloud apps and services at a furious pace due to the productivity, collaboration, and convenience they offer. And why wouldn’t they? If you have a problem, there’s probably a cloud app that can solve it. Plus, on a company-wide level moving away from traditional licensed software to cloud platforms like Office 365, G Suite, Salesforce, etc. delivers the additional benefit of moving from a capex to an opex financial model for your software costs.
Tags : 
     Symantec
By: Cisco     Published Date: Jul 11, 2016
Pulsant is a United Kingdom-based IT infrastructure services provider focused on the small and medium-sized enterprise market. It offers public, private, and hybrid cloud services and a variety of managed, collocation, and professional services. Pulsant was one of the first cloud service providers to embrace software-defined networking (SDN) as a way to simplify its IT infrastructure, unify control of physical and virtual environments, and reduce capital expenses (capex) and operating expenses (opex). After evaluating a number of vendors, Pulsant chose Cisco's Application Centric Infrastructure (ACI) as the best SDN solution for delivering its hybrid cloud services.
Tags : 
     Cisco
By: HP and Intel     Published Date: Aug 13, 2012
Forrester Consulting provides an analysis of four HP 3PAR Storage customer implementations to quantify the efficiency and cost savings achieved over legacy storage platforms. On average, HP 3PAR Storage customers achieved a 10.4 month payback period with a 55% ROI over a 3-year evaluation period and a significant reduction in CapEx and OpEx over that same period as a result of thin provisioning, maintenance costs avoided and labor productivity gains
Tags : hp 3par storage, storage management, maximizing roi, total economic impact, security, storage, data management, data center
     HP and Intel
By: IBM     Published Date: Oct 10, 2013
Virtualization is one of the most highly demanded of all IT projects this decade because it enables enterprises to reduce capex and opex costs and at the same time increase business efficiency and agility. However, implementing, supporting, and managing virtualization can often be difficult tasks, especially as deployments increase in scale and complexity and impact more areas of the datacenter. These more complex infrastructures often require highly skilled engineers with in-depth business knowledge and systems management capabilities. Projects such as infrastructure optimization and automation initiatives for self-service provisioning are key because they enable enterprises to streamline business processes and utilize cloud strategies and mobility solutions. IDC shows how partnering with experts who can implement, optimize, support, and manage virtualized environments may be the right course of action. By utilizing partners, enterprises will be able to avoid some of the potential pit
Tags : virtual environment, business initiatives, maximize initiatives, datacenter, complex infrastructure, business efficiency, business agility, deployments
     IBM
By: IBM     Published Date: Jan 02, 2014
Buy-and-hold strategies can actually add costs to the datacenter, as systems age in place. Not only do hardware maintenance and software maintenance fees rise, over time – but the aging of applications also costs the organization money. Investing in a transition from POWER5 to POWER7 resulted in a return on investment (ROI) of more than 150 percent over three years.An insightful and and compelling discussion by IDC that reviews the primary reason for maintaining current systems -- Return on Investment. IDC studied IBM Power Systems sites that remained on the POWER5 platform long after its initial introduction in 2004. When comparisons to the succeeding generation of POWER7 are made, customers have found that the increase in scalability and performance of POWER7 systems, combined with a reduction in server "footprint" size and overall electrical requirements, resulted in significant reductions in ongoing costs, or opex, per 100 end users supported.
Tags : ibm, idc, server transition, server alternatives, business value, operating costs, hardware platforms, server life cycles
     IBM
By: Cisco     Published Date: Dec 21, 2016
Pulsant is a United Kingdom-based IT infrastructure services provider focused on the small and medium-sized enterprise market. It offers public, private, and hybrid cloud services and a variety of managed, collocation, and professional services. Pulsant was one of the first cloud service providers to embrace software-defined networking (SDN) as a way to simplify its IT infrastructure, unify control of physical and virtual environments, and reduce capital expenses (capex) and operating expenses (opex). After evaluating a number of vendors, Pulsant chose Cisco's Application Centric Infrastructure (ACI) as the best SDN solution for delivering its hybrid cloud services.
Tags : 
     Cisco
By: HP     Published Date: Aug 08, 2014
Although modern backup solutions can offer significant recovery agility, backup as an IT process is generally less than “enough” for the data protection goals that IT is being asked to deliver. As IT is embracing snapshots, replication, archiving, and availability mechanisms to enhance business continuity/disaster recovery (BC/DR) preparedness, it is important to realize that there is a better way than piecemealing each component, and then wondering why CapEx and OpEx are so out of line.
Tags : vendor, backup, recovery solutions, lower costs, speed recovery, infrastructure, risk, simplified management
     HP
By: HPE     Published Date: Oct 07, 2014
So far, most data centers have virtualized their least-critical workloads as a matter of basic cost containment. Virtualizing mission-critical applications is still forthcoming for the majority,though, largely due to infrastructural concerns. Complicating matters is the shift in IT purchasing decisions from IT to business management. Integrated Computing Platforms (ICPs), private cloud computing, and public cloud services all leverage virtualization to achieve a number of IT and business goals, including increased ROI, reduced OpEx, and business process improvement. Now more than ever, it makes sense to explore the benefits of ICPs. Find expert data center considerations here.
Tags : virtualization, data center, cloud, infrastructure, integrated, optimization, solution, it management
     HPE
By: HP     Published Date: May 10, 2011
This paper outlines the potential savings on capital and operational expenditures with a converged infrastructure and explains the benefits of the leading integration solutions.
Tags : hp bladesystem matrix, converged infrastructure, tco, capex savings, opex savings, hp virtual connect, flex-10
     HP
By: IBM     Published Date: Sep 27, 2013
Buy-and-hold strategies can actually add costs to the datacenter, as systems age in place. Not only do hardware maintenance and software maintenance fees rise, over time – but the aging of applications also costs the organization money. Investing in a transition from POWER5 to POWER7 resulted in a return on investment (ROI) of more than 150 percent over three years.An insightful and and compelling discussion by IDC that reviews the primary reason for maintaining current systems -- Return on Investment. IDC studied IBM Power Systems sites that remained on the POWER5 platform long after its initial introduction in 2004. When comparisons to the succeeding generation of POWER7 are made, customers have found that the increase in scalability and performance of POWER7 systems, combined with a reduction in server "footprint" size and overall electrical requirements, resulted in significant reductions in ongoing costs, or opex, per 100 end users supported.
Tags : 
     IBM
By: Hewlett Packard Enterprise     Published Date: Jul 18, 2018
Forrester study reveals how a typical HPE SimpliVity customer reduces total cost of ownership by 69% by consolidating infrastructure, reducing CAPEX and OPEX, and simplifying system administration. The cost savings enable a 183% investment return with a short 7.2 month payback.
Tags : 
     Hewlett Packard Enterprise
By: DellEMC and Intel®     Published Date: Sep 25, 2017
L’optimisation des infrastructures IT par des serveurs de pointe et régulièrement actualisés permet aux organisations d’améliorer l’agilité, d’augmenter l’efficacité et de réduire les OPEX. La gamme Dell EMC PowerEdge, équipée des processeurs Intel® Xeon® Platinum, offre plus d’automatisation, d’évolutivité et de sécurité pour s’assurer que les infrastructures IT fonctionnent au maximum. En savoir plus sur la nouvelle génération de serveurs PowerEdge. Des options de financement souples sont disponibles auprès de Dell Financial Services. Processeur Intel® Xeon® Intel Inside® pour une productivité exceptionnelle. Ultrabook, Celeron, Celeron Inside, Core Inside, Intel, Intel logotyp, Intel Atom, Intel Atom Inside, Intel Core, Intel Inside, Intel Inside logotyp, Intel vPro, Itanium, Itanium Inside, Pentium, Pentium Inside, vPro Inside, Xeon, Xeon Phi och Xeon Inside är varumärken som tillhör Intel Corporation eller dess dotterbolag i USA och/eller andra länder
Tags : ultrabook, celeron, celeron inside, core inside, intel, le logo intel, intel atom, intel atom inside
     DellEMC and  Intel®
By: Dell and VMWare     Published Date: Oct 26, 2017
L’optimisation des infrastructures IT par des serveurs de pointe et régulièrement actualisés permet aux organisations d’améliorer l’agilité, d’augmenter l’efficacité et de réduire les OPEX. La gamme Dell EMC PowerEdge, équipée des processeurs Platinum, offre plus d’automatisation, d’évolutivité et de sécurité pour s’assurer que les infrastructures IT fonctionnent au maximum. En savoir plus sur la nouvelle génération de serveurs PowerEdge. Des options de financement souples sont disponibles auprès de Dell Financial Services.
Tags : 
     Dell and VMWare
By: Apptio     Published Date: Jul 16, 2019
With increased adoption, cloud footprints are getting larger and more unwieldy to manage. Organizations know they must analyze and consolidate their cloud bills to stop cloud waste eating into OpEx budgets. Extensive cloud adoption driven by a “cloud-first” mandate isn’t inherently sprawl, but do you know the business initiatives that spend is supporting? What alternatives did you consider? How is spend tracking? Download this guide to stop cloud sprawl from undercutting your IT strategy.
Tags : 
     Apptio
Start   Previous    1 2 3     Next   End
Search White Papers      

Add White Papers

Get your white papers featured in the insideHPC White Paper Library contact: Kevin@insideHPC.com